A glazier has asked me to provide structural calculations for a concrete anchor bolt use to tie off his harnesses which he will use in multiple locations on a skyscraper during glass replacement. They do the replacement from the inside of the building, and the anchor bolt will hopefully never see load.
Is this a high liability assignment? Would I be named in the lawsuit if there was an accident unrelated to the anchor failing ? Or is this more like designing a catwalk for an industrial plant?