The contract I’m working on is entering a new phase, which calls for a lot of levelling to be done on 804 and black top levels.
Is there any spreadsheet available on the web where I can just enter the readings and the results are instantaneous? I tried looking myself on the net, but have made little success in finding anything.
If not how would one write the commands for linking the IS to the BS and FS and then do a change point?
Is there any spreadsheet available on the web where I can just enter the readings and the results are instantaneous? I tried looking myself on the net, but have made little success in finding anything.
If not how would one write the commands for linking the IS to the BS and FS and then do a change point?