canwesteng
Structural
- May 12, 2014
- 1,704
I have a large pole (say 2 feet in diameter) standing in a pile of bulk material. If half the pile is emptied, how would I calculate the lateral pressure from the remaining pile on the pole? And what might the pile look like?