m63
Civil/Environmental
- Dec 4, 2002
- 29
What would be the best way to reinforce existing 2x12@16 c/c roof joists for additional point loads since only way to double the joist would be to install second ply in two shorter lengths (installation of full length joist is space restricted)? Could it be still considered as a built-up beam when additional two shorter pieces nailed to existing;assuming splice piece provided at butt joint and avoiding max moment region for splice location?