flexflo
Civil/Environmental
- Sep 11, 2009
- 3
Want to significantly increase capacity of an old 8" crude pipeline that is 40 miles long on level terrain. MOP 750 psi based on design strength of the pipe. Installing four intermediate pump stations plus DRA would achieve the objective more economically than looping the entire line. Is it feasible to have that many stations only 8 miles apart or would I have line up problems due to transient pressure issues? How close is too close?