i'd bet money it was designed assuming ideal soil conditions with liberal assumptions on the design parameters and then in construction, the backfill was thrown in with minimal care to details about the backfill materials, compaction, watertight storm structures, wall dimensions itself, etc. and i would almost be willing to be the designer disclaimed much of their responsibility on the owner, owner's rep, contractor and/or homeowner. in other words, i think it's a generic wall "design" with no/little backup data to substantiate the assumptions made by the designer...but they'll point fingers at everyone else that had even the most remote participation in the project.