BenNeal
Mechanical
- Dec 11, 2001
- 2
A 3rd gas processing train is being added to existing two trains. The existing ones have a common flare system. The 3rd will have a new flare. My questions are:
1. Can both flares be built in the same area? is there any spacing requirements?
2. To design the new flare for the capacity of the total three trains, what are the possible restrictions?
3. what information of existing flare system would be required for the design of the new one?
1. Can both flares be built in the same area? is there any spacing requirements?
2. To design the new flare for the capacity of the total three trains, what are the possible restrictions?
3. what information of existing flare system would be required for the design of the new one?