jrwchem
Chemical
- Feb 12, 2006
- 28
Does anybody have any experience in designing instrumentation flush systems for instruments in slurry (FCC frac bottoms) service?
Is it common to use intermittent or continuous flushes? Hardpiped?
Any advice?
Thanks.
Jon
Is it common to use intermittent or continuous flushes? Hardpiped?
Any advice?
Thanks.
Jon