I was recently given the task of moving all our ASME Code vessel work to outside suppliers. This has enabled us to save a lot of money as ASME code work was a small part of our business. However, now we are starting to receive numerous ASME vessels into one of our facilities and there is no QC system set up for inspection. Does anyone have any examples of reliable and accurate ASME checklists that they use to determine if a vessel is accebtable or needs to be rejected. Not being very familiar with the things I should be looking for has made this exercise of making a company QC checklist very difficult. And since our old QC manger has left, it makes it even more difficult to tap the resources I need to make a quality QC form everyone can follow when a vessel comes in the door.