SteamEjectors
Mechanical
- Sep 2, 2010
- 8
Dear all,
the equipment is an Evacuation Unit for Turbine-Condensers in Power Plants in India.
The unit consists of a Surface- Condenser, Motive Steam Piping and Suction Piping (one skid). The unit is not directly connected to the boiler.
DESIGN DATA:
Surface Condenser
Tube Side (Cooling Condensate): p=9,00 barg T= 100°C V= 180 l
Shell Side (Steam): p=0,98 barg T= 320°C V= 200 l
Motive Steam Piping: p=20,7 barg T=365°C DN 50 (max)
Suction Air Piping: p=0,98 barg T=300°C DN 150 (max)
My question:
Is this unit because of the Design Data´s under the IR? If yes, what is the normal procedure (3rd Party; special requ. for Manufacturer etc.).
Thank you very much in advance.
Tim
the equipment is an Evacuation Unit for Turbine-Condensers in Power Plants in India.
The unit consists of a Surface- Condenser, Motive Steam Piping and Suction Piping (one skid). The unit is not directly connected to the boiler.
DESIGN DATA:
Surface Condenser
Tube Side (Cooling Condensate): p=9,00 barg T= 100°C V= 180 l
Shell Side (Steam): p=0,98 barg T= 320°C V= 200 l
Motive Steam Piping: p=20,7 barg T=365°C DN 50 (max)
Suction Air Piping: p=0,98 barg T=300°C DN 150 (max)
My question:
Is this unit because of the Design Data´s under the IR? If yes, what is the normal procedure (3rd Party; special requ. for Manufacturer etc.).
Thank you very much in advance.
Tim