Structural
I came across a situation where contractor ran out of grout under steel base plate and 1" of portion remained empty without grout under base plate. Does anyone suggest a good retrofit solution?
I am thinking about installing shims and welding together. its about 20" x 20" x 1 1/4" base plate.
thanks in advance.
I am thinking about installing shims and welding together. its about 20" x 20" x 1 1/4" base plate.
thanks in advance.