slickdeals
Structural
- Apr 8, 2006
- 2,268
Folks,
Should a 1.6 multiplier for live load be used in conjunction with the 2.0 multiplier for impact loading resulting in a 3.2 multiplier on the service load?
Should a 1.6 multiplier for live load be used in conjunction with the 2.0 multiplier for impact loading resulting in a 3.2 multiplier on the service load?