I am a relatively new ICPR user, and had 2 questions regrading model setup for a project. The project only has one basin, and there are 2 subareas.
In existing conditions, the site is undeveloped (i.e., no pipes, channels, ponds, etc.). Therefore, I have 2 nodes (one for each subarea) - and I am trying to determine how to model the peak flow for the basin without any links. Basically, I am trying to figure out how to set up the exsiting conditions model in ICPR to produce the same results as I would get using the ADDHYD command for the subareas in TR-20 (i.e., how to get a peak flow for the composite hydrograph of the basin without routing the individual subarea peak flows).
My other question (for the proposed conditions model) is similar in nature. I have a pond in one subarea (Subarea 1),and a small storm drain system in Subarea 2. I have also added a boundary condition.
The Tt in the storm drain system (which is quite small) has already been incorporated into the TR-55 Tc calcs. Again, I am trying to determine how to ADDHYD the routed Subarea 1 hydrograph with the unrouted Subarea 2 hydrograph.
Any help would be greatly appreciated.
In existing conditions, the site is undeveloped (i.e., no pipes, channels, ponds, etc.). Therefore, I have 2 nodes (one for each subarea) - and I am trying to determine how to model the peak flow for the basin without any links. Basically, I am trying to figure out how to set up the exsiting conditions model in ICPR to produce the same results as I would get using the ADDHYD command for the subareas in TR-20 (i.e., how to get a peak flow for the composite hydrograph of the basin without routing the individual subarea peak flows).
My other question (for the proposed conditions model) is similar in nature. I have a pond in one subarea (Subarea 1),and a small storm drain system in Subarea 2. I have also added a boundary condition.
The Tt in the storm drain system (which is quite small) has already been incorporated into the TR-55 Tc calcs. Again, I am trying to determine how to ADDHYD the routed Subarea 1 hydrograph with the unrouted Subarea 2 hydrograph.
Any help would be greatly appreciated.