- #1
SteelPE
Structural
- Mar 9, 2006
- 2,759
Sorry for the rant
I hate slabs on grade. Everyone seems to know everything about slabs on grade. Owners, contractors, the end users second cousin twice removed. No matter what I show on the drawings based upon the very limited information I am given the client complains and wants something different.
I show a 6” slab they want a 5” slab
I show a 5” slab they want a 7” slab
I show a 7” slab they want a 4” slab
We only use 3,000 psi concrete for our slab on grade!
We only use fibermesh for our slabs!
We cut our contraction joints at 20' o.c.!
We cut our contraction joints at 10' o.c.!
blah blah blah.
It is the bane of my existence. I said everyone knows everything about slabs. That is not entirely true. They know everything about what they exactly want to load them with and how they want to load them. You ask those questions and crickets.
Sorry about that.
I hate slabs on grade. Everyone seems to know everything about slabs on grade. Owners, contractors, the end users second cousin twice removed. No matter what I show on the drawings based upon the very limited information I am given the client complains and wants something different.
I show a 6” slab they want a 5” slab
I show a 5” slab they want a 7” slab
I show a 7” slab they want a 4” slab
We only use 3,000 psi concrete for our slab on grade!
We only use fibermesh for our slabs!
We cut our contraction joints at 20' o.c.!
We cut our contraction joints at 10' o.c.!
blah blah blah.
It is the bane of my existence. I said everyone knows everything about slabs. That is not entirely true. They know everything about what they exactly want to load them with and how they want to load them. You ask those questions and crickets.
Sorry about that.