attached is a concept for installing an equipment platform inside an existing warehouse that has an existing conc slab and limited headroom...the upper portion will be shop assembled...the lower portion consists of (4) loose cols......using (2) cranes the upper portion of platform w/equip is lifted and held in place while the (4) lower cols are positioned in place....the platform is then lowered to within 1/2" of field splice and held in place while the (4) field bolts are installed and cols aligned and bolts tightened...then whole assembley is lowered the remaining 1/2" and cols are welded to pre-installed base plates on conc slab...then plates @ field are welded together ...then cranes are removed....
my main concern right now is the safety of the workers as they install, align and tighten the bolts @ the field splice and also positioning the (4) loose cols into place under a suspended load....is anyone aware of OSHA requirements for safety while working under a suspended load?....I would also welcome any ideas or improvements on how to accomplish this...thanks for your help
my main concern right now is the safety of the workers as they install, align and tighten the bolts @ the field splice and also positioning the (4) loose cols into place under a suspended load....is anyone aware of OSHA requirements for safety while working under a suspended load?....I would also welcome any ideas or improvements on how to accomplish this...thanks for your help