I know very little about hydraulic systems but am looking at one for closure of ESD valves.
We have pumps (not normally running) and accumulators which will provide system volume to move valves.
I'm wondering about the criticality of the charge time of these accumulators. The duty pump kicks in when system pressure drops by a certain amount to re charge the system and accumulators. I'm wondering what the time to charge the system back to the required pressure should be, if this is important and why?
Thanks
We have pumps (not normally running) and accumulators which will provide system volume to move valves.
I'm wondering about the criticality of the charge time of these accumulators. The duty pump kicks in when system pressure drops by a certain amount to re charge the system and accumulators. I'm wondering what the time to charge the system back to the required pressure should be, if this is important and why?