jkdrummer
Aerospace
- Mar 13, 2013
- 3
We produce mechanical drawings for ground support tooling in aerospace. The number of drawing changes due to either a drawing engineering error or drafting errors has to be reduced as per our leaders.
We are a large company and have standards, checkers, designers and engineers doing it all together. The errors range from wrong heat-treatment specs, parts list errors, to missing dimensions. Our drawings do not require GD&T so it's not rocket science. Most of these errors are found by the fabricators and then we issue a drawing revision. And we get tracked on the quantity of errors and the number of drawings being scheduled and revised. The checkers are naturally the ones to blame, but they work hard and that's all they do all day.
Has anyone else had this task to reduce these error numbers with success?
We are a large company and have standards, checkers, designers and engineers doing it all together. The errors range from wrong heat-treatment specs, parts list errors, to missing dimensions. Our drawings do not require GD&T so it's not rocket science. Most of these errors are found by the fabricators and then we issue a drawing revision. And we get tracked on the quantity of errors and the number of drawings being scheduled and revised. The checkers are naturally the ones to blame, but they work hard and that's all they do all day.
Has anyone else had this task to reduce these error numbers with success?