whyun, you've hit the nail on the head. I blame the architects.
On a totally serious note, if you're going to say "see struct. dwgs." or anything similar, put which drawing, which, detail and coordinate ALL the work before the package goes out for bid. I've lately been involved in trying to goes backwards, tracing the "see this or that dwg" and it's a real pain - but I take solace in that I ended up finding out the exact individual to blame. He didn't like it but he had to suck it up.
Really, what is the big deal with a little more good coordination? How hard is it for the electrical or mechanical folks or the $#%& architect to tell us what's going where on a daily basis?