How do we define the existing reinforcement (ratio) in a concrete frame member (column, beam and shear wall) when performing pushover analysis in SAP2000?
Please help. Thanks in advance...
Luke
How do we define the existing reinforcement (ratio) in a concrete frame member (column, beam and shear wall) when performing pushover analysis in SAP2000?