donf
Chemical
- Jan 23, 2003
- 116
I have an underground pipeline in which the contents may be frozen. Not at liberty to divulge the contents, but product starts to gel at 50F. Pipe size is NPS 3. Length in excess of two miles.
I know very little about pigging. Does anyone know if there's such a thing as a heated pig? I could install launching/receiving stations. 316SS would be acceptable material of construction for the pig.
Thank you for your time.
donf
I know very little about pigging. Does anyone know if there's such a thing as a heated pig? I could install launching/receiving stations. 316SS would be acceptable material of construction for the pig.
Thank you for your time.
donf