I am wanting to know if i include my 500 hose in the calculations if i am going to be using a fire pump and tank. i am just running a calc to make sure what the system demand is. I don't want to give the pump guy a false figure. I know we will need a tank on this project and from what i understand when you have a tank you don't need to add the hose duration to your calculations. but, since i don't have the tank yet do I add the 500 hose to my calcs? i dont want to tell him i have a demand of 1800 gpm when it could be a smaller pump at 1300 gpm. Please advise.