JanMac said:The doubt is that the aci not clearly mention at which section should be checked for 2Mu minimum. On the other hand PCI states that this provision is applied at critical section. In the case of having straight strands the critical section is considered at midspan.
This is true but falls into the same category as permitting beams to have no shear reinforcement if the shear force is small compared to Vuc. The ACI's 1.33 factor is also a version of this.IDS said:Cracking moments are often higher than the design value, and the consequences of cracking with inadequate capacity of the cracked section are potentially sudden failure of the section.