An egress well was installed in the wrong place in a foundation and now the architect wants to have it moved to where it should be. All the walls are all ready poured with #4 rebar running the length of the walls (horizontal) at about 3' o.c. (my guess - can be verified).
The architect wants to simply cut a hole in the wall and rebar to place another egress window in the correct place.
Is this even possible? Is there anyway to reinforce this hole post-pour?
The architect wants to simply cut a hole in the wall and rebar to place another egress window in the correct place.
Is this even possible? Is there anyway to reinforce this hole post-pour?