adiem
Mechanical
- Sep 25, 2002
- 14
I am looking at the design of hold down bolts on a four legged tank with a blast loading. I have calculated the overturning moment due to the blast loading and I need to calculate the uplift loading on the bolts. Do I divide the moment by half the pitch of the hold down bolts to calculate the tensile loading on the bolts or am I doing something wrong?