ASME B30.11 looks like it is construction, installation, operation, inspection, testing,
and maintenance of under hung crane and monorail systems.
per ASME B30.11-2010
"11-2.2.2 (d) If a load test is conducted, the load shall be not less than 100% of the rated load of the crane or monorail
system or more than 125% of the rated load, unless otherwise recommended by the manufacturer or a qualified person."