Does repeated hipot testing of a transformer during the production process significantly degrade the isulation of the magnet wire?
There are times when it would seem logical to test a unit following a particular step during the prodution process to verify that there is no shorting to other windings or to the core/case before proceeding to the next step in production. Typically this test is done 2 to 3 times but it can be as many as 4 or 5 times for a particular unit. Some have argued that hipot testing is a destructive test and should be done as little as possible.
I would greatly appreciate any knowledge or wisdom on this subject.
There are times when it would seem logical to test a unit following a particular step during the prodution process to verify that there is no shorting to other windings or to the core/case before proceeding to the next step in production. Typically this test is done 2 to 3 times but it can be as many as 4 or 5 times for a particular unit. Some have argued that hipot testing is a destructive test and should be done as little as possible.
I would greatly appreciate any knowledge or wisdom on this subject.