Structural
Jun 1, 2009
1,045
I can't find anything in ACI318 that prohibits this. In a tied concrete column, if ties would be provided at say 12"o.c. I would think it is acceptable to provide a #4 spiral with a 12" pitch. I would not be considering this a 'spiral' as is grossly violates those rules, so I think of it as a helical tie.

Anyone know of something that prohibits this use?
 
Replies continue below

Recommended for you

I dont get it. if you saying you would provide a spiral but call it helical it would be ok by code? whats the difference?
 
Let me ask it differently. Anyone know of a reason a #4 spiral with a 12" pitch is not allowed as a substitute for #4 ties @12" spacing?

I was trying to clarify that for the purposes of the design strength, the column is considered tied. I would not use the 'spiral' axial strength
 
I can't think of anything prohibiting what you're proposing as long as you design it as tied, though I never specifically looked either. What's the benefit to doing this?
 
I think I get it now. I dont think you can argue its closed. sprials usually are closer spaced.
 
I wouldn't dream of considering it a spiral column, definitely tied.

As for why, the contractor asked if he could do it that way instead of using ties. No idea why
 
Do the ties need a min. angle of bend at each vert. bar, to confine the vert. bars? Aren’t a 90̊ bend and a 135̊ hook o.k. as long as they alternate? Any confinement violation in that respect? How big is the dia. of the column? I can imagine these coming out to the job looking like a slinky, and then just being pulled up around the vert. rebars, and then just tied off. Although, the pitch spacing may be a bit tricky in the field; whereas a rectangular tie is spaced and tied at the corners and then tied off to the other verts. What’s the max length you can get #4 rebar? I can see a rebar faber. loving this; he’d just stuff 20 or 30' rebar lengths into a bender/roller, and run full length spirals (slinkies); no cutting or bending at exact locations.
 