What is the importance of testing for helical piers before installation? If the helical pier contractor assumes the responsibility to provide piers with a certain capacity with a required factor of safety, why is it important to do load testing? Are they required to do this testing by code or is it the owner/engineer’s call to ask for load tests.
I have a situation where the specs are somewhat not clear on the required testing and now the pier contractor is asking for $3000 a pop for a test. He has done satisfactory work about a mile away from the project, so its not like he is novice and unfamiliar with the area.
Thanks.
I have a situation where the specs are somewhat not clear on the required testing and now the pier contractor is asking for $3000 a pop for a test. He has done satisfactory work about a mile away from the project, so its not like he is novice and unfamiliar with the area.