dlnva350
Civil/Environmental
- Jan 29, 2008
- 9
I’m working on several HEC-RAS models for a drainage study. Our stream restoration team has conducted geomorphic surveys of the stream channels. The spreadsheet used for this process provides output that includes bankfull flowrates. The 1.5 year event is said to be responsible for bankfull flow. While it’s not a linear relationship, we split the difference between the 1 and 2-yr event to define the 1.5 yr storm depth. Flows calculated using the SCS method (with HydroCAD) are significantly higher. I’m talking at least 5 times higher than the geomorphic survey spreadsheet expects for bankfull flow. Our TR-55 1.5-YR flows are out of the channel (flooding the overbanks). Generally speaking, I doubt that 1.5-YR events flood streams.