Hey All,
I am modeling a stream in HEC-RAS that crosses under a large 4 lane highway with dual 8'x10' box culverts, and then further upstream crosses a dirt road with an old masonry arch bridge. The stream has been modeled by FEMA before, but since then the stream has been realigned. The re-aligned stream was studied by another engineer in the area but a LOMC was never finalized with FEMA.
The problem is this: when I run the encroachment analysis on the stream (started with method 4, but have tried all methods), the downstream 1/2 of the model runs normally( b/t 0.5-1' increases), but on the upstream side of the box culverts, the encroachment elevations are between 4.5-5 feet higher than 100yr, regardless of the target WS values I use. Even when I manually make the encroachment wider by specifying stations, the encroachment elevations stay the same! It's like the model isn't calculating something correctly.
I have some experience with HEC-RAS but far from an expert. The downstream cross sections are relatively narrow (~200 ft), and the sections upstream of the culverts are much wider (~1000 ft), could this have something to do with it?
Thanks for any and all help!
David
I am modeling a stream in HEC-RAS that crosses under a large 4 lane highway with dual 8'x10' box culverts, and then further upstream crosses a dirt road with an old masonry arch bridge. The stream has been modeled by FEMA before, but since then the stream has been realigned. The re-aligned stream was studied by another engineer in the area but a LOMC was never finalized with FEMA.
The problem is this: when I run the encroachment analysis on the stream (started with method 4, but have tried all methods), the downstream 1/2 of the model runs normally( b/t 0.5-1' increases), but on the upstream side of the box culverts, the encroachment elevations are between 4.5-5 feet higher than 100yr, regardless of the target WS values I use. Even when I manually make the encroachment wider by specifying stations, the encroachment elevations stay the same! It's like the model isn't calculating something correctly.
I have some experience with HEC-RAS but far from an expert. The downstream cross sections are relatively narrow (~200 ft), and the sections upstream of the culverts are much wider (~1000 ft), could this have something to do with it?
Thanks for any and all help!
David