rotocor
Civil/Environmental
- Dec 6, 2002
- 3
I need to know how much heat in BTUs I will require and how long it will take to raise the temperature of a concrete core or cylinder 18" in diameter and 12 inches high to a depth of 1" all around, from 32ºF to 50ºF and the same for the corresponding concrete hole of similar size. We plan to use hot air as a heat source at a temperature between 150º-200ºF and the optimum time would be 30 - 45 minutes. The application is required to heat the concrete so as to allow cementatious grout used to rebond the cylinder back into the concrete substrate to set up and gain strength (20-30 minutes) before surface frost returns under winter conditions. Thanks