jkampana
Mechanical
- Aug 2, 2011
- 45
I'm doing a dry system in a concrete parking structure. It is a two level structure and it is post tension slab on top of pillars. I'm curious what methods you all use for hangers for the pipes and sway bracing in such a scenario? Does anybody have any details that you could share? Thanks for the help.