mn321
Structural
- Aug 9, 2010
- 5
I was wondering isf anyone knew how to determine the hairpin required length to be embedded in the slab.
I have 15 kips. If I use 0.9 x .750(#6 bar) x 60 ksi = 37.8 kips. If I wish to determine how long I need the hairpin to penetrate into the slab.
I have 15 kips. If I use 0.9 x .750(#6 bar) x 60 ksi = 37.8 kips. If I wish to determine how long I need the hairpin to penetrate into the slab.