aayjaber
Structural
- Feb 16, 2008
- 47
I am planning to build a structure on a rocky site, my initial excavations lead me to believe that the site is made up of very loose small boulders the first 1-2 ft and the boulders get bigger as you go deeper. The joints between the boulders range from 2-10 inches in width and run along almost upwards in the same direction even though some joints overlap.
I am planning to clean the joints by pressurized water jet as deep as I can go and fill the cleaned joints with cement grout. Will this stabelze the building pad?
I am planning to clean the joints by pressurized water jet as deep as I can go and fill the cleaned joints with cement grout. Will this stabelze the building pad?