Owner is preparing to make new Communication Tower inside Power Plant, too far from any Grounding Grid.
Tower must be grounded with 4 ground rods /square layout/. That what must be provided is Ground Resistance R = 5 Ohms minimum. Soil is good - no sand, no stone. If Ground Resistance is R > 5 ohms, I have to provide extra ground wires and extra ground rods.
I am trying to calculate this, but I do not have here any Grounding Software or any book with a calculation.
I welcome any article or softyware from Grounding Calculation.