We've got to do a strain gauge installation of a gas supply pipe to monitor it for stress changes due to subsidence. (about 8" dia)
As for normal strain gauge installations, we need to prepare the surface by grinding away paint and getting a nice smooth surface finish.
Problem for me is grinding sparks and gas don't mix very well.
The boss says we'll be fine, just bring a gas metre and it'll be alright.
I'm thinking adequate prepartaion for this is to write my will and get an extra life insurance premium.
Any thoughts?
As for normal strain gauge installations, we need to prepare the surface by grinding away paint and getting a nice smooth surface finish.
Problem for me is grinding sparks and gas don't mix very well.
The boss says we'll be fine, just bring a gas metre and it'll be alright.
I'm thinking adequate prepartaion for this is to write my will and get an extra life insurance premium.
Any thoughts?