Thanks in advance,
I have a question on designing gravel trenches. I currently have 3 reaches(1r, 2r & 3r) that drain into an existing pond. They are actually a 400' x 4'x 4' gravel trench. When I turned the reaches into ponds following this example ( the program then says that it cannont extend above a certain elevation. In order to get it to work I have to change the inverts to an unrealistic elevation. The reason I ask this is because in my model with the reaches it says that the reach conditions have not been evaluated([52]Hint:Reach Inlet/Outlet conditions not evaluated). I'm assuming this means that it doesnt take into account the flows of the drainage ares that are attached to the reaches.
I have a question on designing gravel trenches. I currently have 3 reaches(1r, 2r & 3r) that drain into an existing pond. They are actually a 400' x 4'x 4' gravel trench. When I turned the reaches into ponds following this example ( the program then says that it cannont extend above a certain elevation. In order to get it to work I have to change the inverts to an unrealistic elevation. The reason I ask this is because in my model with the reaches it says that the reach conditions have not been evaluated([52]Hint:Reach Inlet/Outlet conditions not evaluated). I'm assuming this means that it doesnt take into account the flows of the drainage ares that are attached to the reaches.