Hello all,
I have an issue maybe I can have some help. I have a commercial building which is on piles. The design calls for driven pipe piles which have been already installed. Then we have pile caps and strap beams on top connecting the interior and exterior caps. Now connecting all the strap beams are grade beams. The Planck call for it to be continuously run through the strap. However the contractor doweled out of the strap using the same rebar as the grade beam. He doweled out of each side of the strap. Is this ok?
Thanks
I have an issue maybe I can have some help. I have a commercial building which is on piles. The design calls for driven pipe piles which have been already installed. Then we have pile caps and strap beams on top connecting the interior and exterior caps. Now connecting all the strap beams are grade beams. The Planck call for it to be continuously run through the strap. However the contractor doweled out of the strap using the same rebar as the grade beam. He doweled out of each side of the strap. Is this ok?
Thanks