esee135
Electrical
- Apr 27, 2005
- 57
Hydro generator question, since gate timing is set for different opening and closing rates, is the governor speed response to a SYSTEM disturbance significantly favored in the underfrequency case more than the overfrequency case? I wonder if an IEEE paper has been written on this?