mrtangent2
Chemical
For piping design of GMP systems is there an EU / British standard which must be followed.
The current systems on a unit we have is clamp ring. Is there an EU standard or reference which dictates this.
thanks
The current systems on a unit we have is clamp ring. Is there an EU standard or reference which dictates this.
thanks