Alpha3TMRI
Geotechnical
- Jan 20, 2006
- 1
Alpha 3 Tesla MRI is working with Fabreeka to plan a slab on grade for installation of a 12 ton MRI machine in Manhattan. Precise soil modeling is needed immediately to determine spring rate and damping properties for NASTRAN analysis. Construction of the slab is scheduled within 2 weeks.