Thank you. I was interested in a more detailed list. In particular, who from various governmental entities would be on the list. Also who from the designers of the bridge. Essentially, who was NOT Aspi or Spea, and what was their position.
It appears that someone HAD been doing some sort of maintenance on the bridge. There are photos that show (I believe) an added structure underneath the roadway, at the towers. And that the one that failed did not yet have that. That DOES look like someone was doing maintenance, though perhaps this task was viewed as something else, like "structural modification".
Since it appears that one of the suspension tension members failed, I am wondering what was supposed to be done by the maintenance people (Aspi, Spea) to prevent it. Or even know about it, to prevent. There was a comment about the "...cables...corroded by sea air.". Since the sea air was a known environmental factor when the bridge was built, what did the designers do to prevent or minimize this corrosion? Did they suggest an inspection method to be followed by the maintenance companies?
spsalso