Hello,
I have a few questions and appreciate your assistance. I was wondering if:
1. The drawing below is complete.
2. Are the positions of the three holes on the left completely defined? Or do I need to define a third datum?
3. Do I need to put all the dimensions into a square (make them basic dimensions)?
4. How is the position of Datum B (in x and y directions) defined?
5. How do you put gd&t on threads of a screws hole? The threads are non-conventional.
6. What happens if hole B is called out through profile tolerance?
Thanks very much!
I have a few questions and appreciate your assistance. I was wondering if:
1. The drawing below is complete.
2. Are the positions of the three holes on the left completely defined? Or do I need to define a third datum?
3. Do I need to put all the dimensions into a square (make them basic dimensions)?
4. How is the position of Datum B (in x and y directions) defined?
5. How do you put gd&t on threads of a screws hole? The threads are non-conventional.
6. What happens if hole B is called out through profile tolerance?
Thanks very much!