albaweld
Petroleum
- Jul 23, 2007
- 29
Hello everyone, hope you all had a pleasant weekend. I'm looking to find where it references the requirement of two gauges when doing hydro testing. (high point--low point)This is for piping and so far I have had no luck in B31:3. Also the length of time when gauges should re-calibrated, is this in Sec V?
All help is greatly appreciated.
Thank you
All help is greatly appreciated.
Thank you