dugjen
Civil/Environmental
- Aug 31, 2001
- 1
When a gas transmission pipe is insatlled under the fed rules cfr192 it calls for bed being compacted
should there be a record from a soil enginer to verify that the soil has been comapacte properly?
For the you information i am tlaking about a 575 psi 22 inch cast pipe natural gas transmission line and a concern that a commuity has with a commercail road being put on top of it running parrell with the pipe.
do you know of any problems that could occur due to improper bedding and compaction?
should there be a record from a soil enginer to verify that the soil has been comapacte properly?
For the you information i am tlaking about a 575 psi 22 inch cast pipe natural gas transmission line and a concern that a commuity has with a commercail road being put on top of it running parrell with the pipe.
do you know of any problems that could occur due to improper bedding and compaction?