Working on a project where the existing building is constructed of light steel frame members and wood exterior panels. The client wants to install an overhead crane system (~38 ft long; 15ton capacity) within the existing building.
The building clearance is limited. Thinking about bracing the each new bridge support column with a truss/batter system. Any other suggestions to complete the frame stability?