Using the 2000 IBC code and current NDS standards.
Can built-up 2x members be substituted for the situations where a 3x member is required per code to achieve the allowable shearwall design values?
i.e. (2)2x6 studs in place of a 3x...
this would ofcourse assume that the built-up studs are properly connected.

any suggestions or interpretations of the code commentary would be greatly appreciated.

Thank you
 
Replies continue below

Recommended for you

This issue has previously been discused.
Do a search.
There is a paper referenced that addresses the issue but I don't have the site address.
 
see summing shear capacities in Moment frame and shear wall engineering
 
I don't think you can substitute 2 - 2x for a 3x member. The primary purpose of requiring the 3" is to avoid wood splits from closely spaced nails, which wouldn't be helped by going to 2 -2x.
 