We are designing protection concrete one way slab to bridge over existing concrete vault (has cover grating) in a road with heavy traffic. The proposed slab will have foundation that will be close to vault walls, I am planning to recommend installing 2" rigid insulation along vault walls to compensate for frost protection requirement of (4 ft.). Is this approach is ideal or someone could advise otherwise?