dantomi
Civil/Environmental
- Jul 2, 2005
- 2
Dantomi(Civil)
I am recently constructing a building in swampy area that required piling. And the piling Engineer has done the piling but requested that the PHC pile- will be filled with concrete for all the 15m. I dont see this as being cost effective. Pls advise.
I am recently constructing a building in swampy area that required piling. And the piling Engineer has done the piling but requested that the PHC pile- will be filled with concrete for all the 15m. I dont see this as being cost effective. Pls advise.