Shouldn't be a big problem. Typical practice treats the 2 m of soil as surcharge acting at the footing's base elevation. That assumes there is no shearing resistance within the top 2 m, so it's probably a tad conservative. Besides, bearing capacity rarely governs allowable anyway - it's usually settlement.